Location:
Irvine, CA
Client:
Irvine Company
Project Highlights:
- Brownfield Site (former United States Marine Corp Base at El Toro)
- Tentative Mapping of the project
- 100-year flood protection berms and desilting basins
- Detailed substructure analysis
- 400 feet of existing roadway removal and reconstruction
- Super-elevated roadway design 4-lane to 2-lane “narrowing” transitioned roadway to facilitate site physical constraints
- Wet utilities infrastructure
- Partial reconstruction of an existing Caltrans concrete channel
Scope of Work:
- Rough Grading Plans
- Street Improvement Plans
- Water & Sewer Improvement Plans
- Storm Drain Improvement Plans
- Hydrology and Hydraulics Analysis
- SWPPP
- Construction Specifications
- Construction support
- Progress Pay Quantity Confirmation
- Design Survey
- Boundary Survey
- Construction Staking
- As-built Drawings