Location:
Riverside, CA
Client:
J.D. Pierce Company, Inc.
Project Highlights:
- Design of major water and sewer facilities to serve the 834-acre, 512-home Lake Hills development
- 1.3 MG reservoir (welded steel tank – AWWA D100) replaced closed system service
- Fire flows provided by reservoir instead of booster station
- 45 DBA booster station
- Two sewage lift stations with sound attenuated generator sets
- Hillside grading challenges
Scope of Work:
- Life Cycle Analysis/Cost Analysis for the proposed facilities
- Improvement plans for 1.3MG potable water storage tank
- Improvement plans for closed system booster pump station
- Improvement plans for sewage lift station design
- Backbone and in-tract water and wastewater improvement plans