


Location:
Desert Hot Springs, CA
Client:
D.R. Horton
Project Highlights:
- 2 MG concrete tank (AWWA D110, Type I)
- Tank piping design: 20-inch outlet piping, 16-inch inlet piping, 16-inch overflow piping, 6-inch tank drain piping, 6-inch ringdrain piping with leak inspection manholes
- Vault housing the 16-inch altitude valve and 20-inch butterfly valve with motor actuator controlled by a seismic sensor
Scope of Work:
- Construction plans
- Technical specifications