


Location:
Port of Long Beach, CA
Client:
Port of Long Beach | Griffith Company
Project Highlights:
- Construction staking for Berths T134-T140 Container Yard and Terminal in Port of Long Beach
- 375-acre shipping terminal that included both truck and rail facilities to move cargo
- Project included 80,000 linear feet of underground utilities including: sewer, water, storm drain and electrical
- Project included 15 miles of track for the extensive rail system which was an integral part of this newly-designed port
Scope of Work (Survey Services):
- Field Control Survey (establishing the horizontal and vertical control for project)
- As-Built staking
- Limits of work and demolition limit staking
- Rough grade staking
- Rail system layout staking
- Staking for layout of concrete runways
- Staking for grid system for the installation of the base course and paving
- Staking for underground utilities certification and inclusion in GIS database including: storm drain, water, sewer and electrical
- Staking for fuel line, and lighting on site