Location:

Irvine, CA

Client:

Irvine Company

Project Highlights:
  • Brownfield Site (former United States Marine Corp Base at El Toro)
  • Tentative Mapping of the project
  • 100-year flood protection berms and desilting basins
  • Detailed substructure analysis
  • 400 feet of existing roadway removal and reconstruction
  • Super-elevated roadway design 4-lane to 2-lane “narrowing” transitioned roadway to facilitate site physical constraints
  • Wet utilities infrastructure
  • Partial reconstruction of an existing Caltrans concrete channel
Scope of Work:
  • Rough Grading Plans
  • Street Improvement Plans
  • Water & Sewer Improvement Plans
  • Storm Drain Improvement Plans
  • Hydrology and Hydraulics Analysis
  • SWPPP
  • Construction Specifications
  • Construction support
  • Progress Pay Quantity Confirmation
  • Design Survey
  • Boundary Survey
  • Construction Staking
  • As-built Drawings